{"id":43576,"date":"2019-06-27T11:04:27","date_gmt":"2019-06-27T15:04:27","guid":{"rendered":"https:\/\/thelehighacresgazette.com\/news\/?p=43576"},"modified":"2019-06-27T11:04:40","modified_gmt":"2019-06-27T15:04:40","slug":"road-watch-lehigh-acres-2","status":"publish","type":"post","link":"https:\/\/thelehighacresgazette.com\/news\/2019\/06\/road-watch-lehigh-acres-2\/","title":{"rendered":"Road Watch &#8211; Lehigh Acres"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"180\" height=\"180\" src=\"https:\/\/thelehighacresgazette.com\/news\/wp-content\/uploads\/2014\/06\/RoadWatch.jpg\" alt=\"\" class=\"wp-image-31471\" srcset=\"https:\/\/thelehighacresgazette.com\/news\/wp-content\/uploads\/2014\/06\/RoadWatch.jpg 180w, https:\/\/thelehighacresgazette.com\/news\/wp-content\/uploads\/2014\/06\/RoadWatch-150x150.jpg 150w\" sizes=\"(max-width: 180px) 100vw, 180px\" \/><\/figure><\/div>\n\n\n\n<p>Intersection Markings: Intermittent lane closures and delays\nare possible on 6-27-19 through 7-3-19 between the hours of 9:00 a.m. to 4:00\np.m. (weather permitting) on the following roadways: Bell Boulevard Milwaukee\nBoulevard <\/p>\n\n\n\n<p>Gunnery Road and 8th Street SW &#8211; A contractor for Lee County\nDOT will have lane closures periodically at the intersection of Gunnery Road\nand 8th Street SW starting Monday, May 20th to August 1st from 9 a.m. to 4 p.m.\nCrews will be working in the north and south bound thru lane of Gunnery Road\nand the eastbound\/westbound lanes of 8th Street SW from Gunnery Road to Floyd\nAve South. Gunnery Road to Gretchen Ave South will be closed to traffic until\nthe widening of 8th Street SW is complete. Motorists should use caution, as\nthere will be lane closures and flagmen working in the work zone. Lane closures\nfor this intersection will be ongoing from May 20th to August 1 st, 2019 of\nthis year. For further questions, please call Jeremy Norvell at 239-533-9321 or\nDirk Danley at 239-533-9305. <\/p>\n\n\n\n<p>Homestead Road from south of Sunrise Boulevard to north of\nAlabama Road: Construction Project: This project consists of widening Homestead\nRoad to four lanes. This work will also improve drainage and install new\nunderground utilities. A six-foot sidewalk will be constructed on both sides of\nthe roadway. Motorists should expect lane closures during daytime hours.\nProject cost is $14.4 million. The contractor is Stevens and Layton, Inc. The\nproject is expected to be complete by early 2020. <\/p>\n\n\n\n<p>\u00b7\nMotorists should expect traffic shifts on Leeland Heights at Homestead Road\nthrough Friday, June 28. <\/p>\n\n\n\n<p>\u00b7\nMotorists should expect traffic shifts on Sunrise Boulevard at Homestead Road\nthrough Friday, June 28. <\/p>\n\n\n\n<p>For further questions, contact Lisa Macias, Cella Molnar\n&amp; Associates at 239-337-1071. <\/p>\n\n\n\n<p>Lee Boulevard &#8211; Gunnery to Sunshine Boulevard: A contractor\nwill be installing aerial fiber optic cable starting Thursday, June 19, 2019\nthrough June 26, 2019. Motorist should use caution, as there will be lane\nclosures in the work zone from 9 a.m. to 4 p.m. For further questions, please call\nJeff Holt at 239-994-0343. <\/p>\n\n\n\n<p>Lehigh Acres Resurfacing Project: A Lee County DOT\ncontractor will be resurfacing the roads in the South East section of Lehigh\nAcres South of Leeland Heights\/Joel Boulevard and East of Homestead starting\nSunday, June 2, 2019 through October 2, 2019. Motorists should use caution, as\nthere may be lane closures in the work zone from approximately 9 a.m. to 4 p.m.\nFor further questions, please call Dirk Danley at 239-533-9305. <\/p>\n\n\n\n<p>Roadwatch Report June 27 \u2013 July 3, 2019 Motorists &#8211; Please\nuse caution when traveling in work zone areas Lehigh Acres Municipal Service\nImprovement District (LA-MSID) Projects: Casey St E. Closure\/Detour &#8211; Lehigh\nAcres Municipal Service Improvement District (LA-MSID) will be replacing\nculvert pipes across Casey St E. in Lehigh Acres. \u00b7 Casey St E. will be closed\nbetween Haskell St E. &amp; Geneva St E. beginning Tuesday June 11th, 2019.\nWarning signs will be posted. Work is expected to be completed by July 1st\n2019. For further questions, please contact LA-MSID at 239-368-0044.<\/p>\n\n\n\n<p>SR 82 from Shawnee Road to Alabama Road:&nbsp;\u202fConstruction\nproject: \u202f\nCrews&nbsp;are&nbsp;widening&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; SR 82 to\nsix lanes from Shawnee Road to Alabama Road.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect intermittent eastbound and westbound lane closures on\u202fSR 82\nduring daytime and nighttime\/overnight hours, Monday through Friday throughout\nthe duration of the project, weather permitting.\u202f\u202f\u202f<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect side road closures throughout the project limits.<\/p>\n\n\n\n<p>Additional work includes construction of a median separating\nthree 12-foot travel lanes in each direction, bike lanes, a 5-foot sidewalk on\nthe north side and a 10-foot shared-use path on the south side. The project\nwill also add a grass median and LED lighting throughout this segment. The\nexpected completion date is late fall 2020. The Contractor is Ajax Paving\nIndustries of Florida, LLC.<\/p>\n\n\n\n<p>SR 82 from Lee Boulevard\/Colonial Boulevard to Shawnee Road:&nbsp;\u202fConstruction\nproject: \u202f Crews&nbsp;are&nbsp;widening SR 82 to six lanes from east of Lee\nBoulevard to Shawnee Road.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect intermittent eastbound and westbound lane closures on\u202fSR 82\nduring nighttime\/overnight hours from 7 p.m. to 6 a.m., Monday through Friday\nthroughout the duration of the project, weather permitting.\u202f\u202f\u202f<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Meadow\nRoad at Gunnery Road is PERMANENTLY closed.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;A\ntemporary traffic signal has been installed at the intersection of Ray Avenue\nSouth and Griffin Drive. Motorists should use caution while driving in this\narea.\u202f<\/p>\n\n\n\n<p>Additional work includes construction of a median separating\nthree 12-foot travel lanes in each direction, 6.5-foot inside paved shoulders,\nbike lanes, a 5-foot sidewalk on the north side and a 10-foot shared-use path\non the south side. The project will also add a grass median and LED lighting\nthroughout this segment. The project also includes constructing Florida\u2019s first\nContinuous Flow Intersection (CFI) at the intersection of SR 82 at Daniels\nParkway\/Gunnery Road. The CFI will ease traffic congestion at the intersection\nand include multiple signals to reduce turning delays. The expected completion\ndate is end of summer of 2019. The Contractor is Ajax Paving Industries of\nFlorida, LLC.<\/p>\n\n\n\n<p>SR 82 from Alabama Road to the Lee\/Hendry County\nline:\u202fConstruction project:\u202f&nbsp;Crews will be widening SR 82 to four lanes\nfrom Alabama Road to the Lee\/Hendry County line.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect intermittent eastbound and westbound lane closures on\u202fSR 82\nduring nighttime\/overnight hours from 7 p.m. to 6 a.m., Monday through Friday\nthroughout the duration of the project, weather permitting.&nbsp;<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect traffic shifts throughout the duration of the project.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect Grant Boulevard closed through Friday, July 5.<\/p>\n\n\n\n<p>\u00b7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Motorists\nshould expect Hedgewood Street closed through Friday, July 12.<\/p>\n\n\n\n<p>Motorists should expect Kalamar Drive closed through\nSeptember 2019.<\/p>\n\n\n\n<p>Additional work includes construction of a median separating\ntwo 12-foot travel lanes in each direction, 6.5-foot inside paved shoulders,\nbike lanes, a 5-foot sidewalk on the north side and a 10-foot shared-use path\non the south side. The project will also add a grass median and LED lighting\nthroughout this segment. The expected completion date is end of 2020. The\nContractor is Sacyr Construction.<\/p>\n\n\n\n<p>SR 82\/Martin Luther King Jr. Boulevard from Rockfill Road to\nOrtiz Avenue:\u202f&nbsp;Construction project:\u202f\u202f&nbsp;Crews will be milling and\nresurfacing SR 82\/Martin Luther King Jr. Boulevard and constructing curb and\nshoulder during daytime and nighttime hours. Work occurs during daytime and\nnighttime hours.\u202fMotorists should expect intermittent lane closures through the\nduration of the project during daytime and nighttime\/overnight hours.&nbsp;Drivers\nshould use caution traveling in this area.\u202f Estimated completion is\nfall&nbsp;2019.\u202f The contractor is Community Asphalt Corporation.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Intersection Markings: Intermittent lane closures and delays are possible on 6-27-19 through 7-3-19 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: Bell Boulevard&hellip; <\/p>\n","protected":false},"author":8,"featured_media":31471,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,32],"tags":[],"_links":{"self":[{"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/posts\/43576"}],"collection":[{"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/comments?post=43576"}],"version-history":[{"count":0,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/posts\/43576\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/media\/31471"}],"wp:attachment":[{"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/media?parent=43576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/categories?post=43576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thelehighacresgazette.com\/news\/wp-json\/wp\/v2\/tags?post=43576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}